Thu, 15 May 2008

Meanwhile at appartment development side.

I installed vater system for the shower and thought to install the whole cabin, but found (as usual) that I do not have drills for the ceramic tiles. So, that will be postponed for a while.
Also I expect glue for ceramic tiles to be delivered today (as long as brick tiles), so that I can start hall granite covering. Although I'm a bit tired after water system installation, which took major part of the day.
It is actually simple task, but only when you have simple access to all parts. Now imagine a 10 sm thick wall, where you managed to drill two holes, each one about 2 sm in diameter (less than two fingers thick). In a meter below-left there is a bigger hole for sanitary (about 15x15 sm). Water system hatch is located 2.5 meters right to this.
Task is to put thin water tubes from water hatch to two small holes, but that splitter would be installed near bigger sanitary hole. Without direct access to any tube (you can only feel it, can not see) you have to connect them (also need to mention, that it is quite hard to put both hands into bigger hole for sanitary system) via different connectors using spanners.

I've completed the task, although not sure if it is really safe. That was challenging, and power sucking, so probably I will just slack this evening and hack some bits of captcha. Will also cover my table with the last colour level (yes, yes, it is still not done) and/or fill second varnish layer for x-shelves (they look really cool after mordant and varnish)...