Meanwhile at appartment development side.
I installed vater system for the shower and thought to install
the whole cabin, but found (as usual) that I do not have drills
for the ceramic tiles. So, that will be postponed for a while.
Also I expect glue for ceramic tiles to be delivered today (as long
as brick tiles), so that I can start hall granite covering. Although
I'm a bit tired after water system installation, which took major
part of the day.
It is actually simple task, but only when you have simple access to
all parts. Now imagine a 10 sm thick wall, where you managed to drill
two holes, each one about 2 sm in diameter (less than two fingers thick).
In a meter below-left there is a bigger hole for sanitary (about
15x15 sm). Water system hatch is located 2.5 meters right to this.
Task is to put thin water tubes from water hatch to two small holes,
but that splitter would be installed near bigger sanitary hole. Without
direct access to any tube (you can only feel it, can not see) you have to
connect them (also need to mention, that it is quite hard to put
both hands into bigger hole for sanitary system) via different connectors
using spanners.
I've completed the task, although not sure if it is really safe. That was
challenging, and power sucking, so probably I will just slack this evening
and hack some bits of captcha.
Will also cover my table with the last colour level (yes, yes, it is still
not done) and/or fill second varnish layer for x-shelves (they look really cool
after mordant and varnish)...