Tue, 22 Jan 2008

Meanwhile at appartment development side.

I spent the whole day filling holes between ceramic tiles (2-3 mm) with the special water-proof plaster. It is about 23:00 in Moscow, but things are not yet completed, but I will postpone it for a while, since tired to work in dust today.
Also got lots of wood plates to either finish table (although they are thiner than table itself) or start book/bottle shelves development. I got about 12 meters of 10 and 13 sm wood plates (three plates of two meters each for each size), each has 2 sm thickness. That should be enough for smaller installation, but since I want to have a et of X-shelves about 2 meters high, I will get more when finish to work with thoe ones. Likely I will start it this weekend.

/devel/flat :: Link / Comments ()