|
|
About ::
TODO ::
Blog ::
RSS ::
Old blog ::
Projects ::
GIT ::
Gallery ::
Notes
Tue, 22 Jan 2008
Meanwhile at appartment development side.
I spent the whole day filling holes between ceramic tiles
(2-3 mm) with the special water-proof plaster. It is about 23:00 in Moscow,
but things are not yet completed, but I will postpone it for a while,
since tired to work in dust today.
Also got lots of wood plates to either finish table (although they
are thiner than table itself) or start book/bottle shelves
development.
I got about 12 meters of 10 and 13 sm wood plates (three plates of two meters each
for each size), each has 2 sm thickness. That should be enough for smaller installation,
but since I want to have a et of X-shelves about 2 meters high, I will get
more when finish to work with thoe ones. Likely I will start it this weekend.
/devel/flat :: Link / Comments (0)
Please solve this captcha to be allowed to post (need to reload in a minute): 21 + 29
|