Zbr's days.
December
Sun Mon Tue Wed Thu Fri Sat
           
23
         
2007
Months
Dec

About :: TODO :: Blog :: RSS :: Old blog :: Projects :: GIT :: Gallery :: Notes

Sun, 23 Dec 2007

Continuing appartments development.

I think I finished ceramic tiles glueing, at least for this year: first, I have no glue anymore, second, I have to glue only one vertical line with 2.5 tiles width, where vater hatch will be located, and since I do not have a hatch, I do not glue tiles.
Dirty work in bathroom has been essentially completed - I will fill 2mm holes between tiles with plaster and attach ceiling soon, and that will be the end.
Next dirty work is ceramic granite in the hall and checkroom - that will take some time, but since I have no glue and not sure it will be delivered this year, I can postpone this task too. So, main issues are painting finishing and table.
When my head is aching I frequently think out something really interesting and new, so I have a new design for the table in the mind, if I will complete it, that will be really great.
First, table is not movable, but attached to wall (potentially two walls in the corner), end of the table, which does not touch the wall is round and have singe (better steel tube) leg, another part, which touches the wall has a turn, so table looks like letter 'L' with smaller part attached to wall (and window), bigger part can be accessible from both sides.
Or something like that...

/devel/flat :: Link / Comments (0)

Please solve this captcha to be allowed to post (need to reload in a minute): 26 * 81

Comments are closed for this story.