Sat, 24 Nov 2007
Meanwhile at appartment development side.
I've completed big arc in the room and finished most of the smaller
arc for the checkroom (rough strong emery paper rocks),
it requires some polishing and eventual
wallpaper glueing and painting. I think I will finish this part
(as long as painting of all room's walls) next weekend. I want to complete
room, checkroom and (hopefully) hall. The latter requires a bit more
work - if I will have enough time and glue for ceramics, I will setup
ceramic granit floor. I hope to get a ceiling and a water system hatch
for the bathroom next weekend too, so that it would be completed too.
When it is ready, I think I will have some rest, or maybe will go a usual way -
proceed with development of the kitchen. It is not that complex and will not
require a lot of time actually, even if I will (and I want to) install
hinged ceiling there too.