Sat, 24 Nov 2007

Meanwhile at appartment development side.

I've completed big arc in the room and finished most of the smaller arc for the checkroom (rough strong emery paper rocks), it requires some polishing and eventual wallpaper glueing and painting. I think I will finish this part (as long as painting of all room's walls) next weekend. I want to complete room, checkroom and (hopefully) hall. The latter requires a bit more work - if I will have enough time and glue for ceramics, I will setup ceramic granit floor. I hope to get a ceiling and a water system hatch for the bathroom next weekend too, so that it would be completed too.
When it is ready, I think I will have some rest, or maybe will go a usual way - proceed with development of the kitchen. It is not that complex and will not require a lot of time actually, even if I will (and I want to) install hinged ceiling there too.

/devel/flat :: Link / Comments (0)

Please solve this captcha to be allowed to post (need to reload in a minute): 28 * 36

Comments are closed for this story.