|
|
About
TODO
Blog
RSS
Old blog
Projects
Gallery
Notes
Sat, 17 Nov 2007
Meanwhile on appartment development side: the concrete jungle king.
Yes, I made it,
I installed lavatory pan and wash-stand in the bathroom, although it is not finished yet
(I did not complete glueing ceramic tiles on the small wall with door and part
of the wall where water/sewerage hatch is located).
This required to complete sewerage and water projects in the bathroom, when I will get
my camera back, I will make some photos - water system is not that trivial: it contains
of filters for hot and cold water, counters, headers (water collectors). It does not yet
support boiler, but I will set it up soon.
One of my fellows live near the
good development shop, so he will bring me a special hatch, where I will install
tiles; neon cord for my hinged ceiling
and ceiling for bathroom.
I think I will complete it this month and it would be great if I install a shower cabin,
since washing without it is a real pain in the ass.
Tomorrow I will start polishing my main arc at the room's door area and will glue
bits of wallpaper I removed when made it, I also plan to start painting on the wallpapers
tomorrow (and of course my 'uchuu').
If there will be enough time I will also develop small arc in the checkroom and install
chains for coatrack.
The nearest future plan include hall development (ceramic granite on the floor, wallpapers
and pains on the walls, fortunately I already finished painting the ceiling, this time
it does not have any special details) and move to the kitchen setup.
I also want to make a table
as soon as possible and start developing interesting
things at home.
Appartment development sucks really lots of my power, but I do like it very much.
Although I frequently break thins and then have to fix that and move forward, it is
a good way I believe.
/devel/flat :: Link / Comments (0)
Please solve this captcha to be allowed to post (need to reload in a minute): 4 + 9
|