Zbr's days.
November
Sun Mon Tue Wed Thu Fri Sat
       
5
 
2007
Months
Nov

About :: TODO :: Blog :: RSS :: Old blog :: Projects :: GIT :: Gallery :: Notes

Mon, 05 Nov 2007

Meanwhile at appartment development side.

I've spent two days glueing ceramic ceils in the bathroom - I think I completed this process by 80%, only one wall, where door is located, is not covered yet and number of vertical parts, where ceil cutting is required is not finished, since I do not have strong enough ceil-cutter (I even tried my corner-grinding machine with metall-cutting disk, but failed). Just after I completed floor glueing, I found that I completely forgot about warmed-floor setup and started to recover the whole surface - that was hard and very frustrating after I spent so much time with level, but I removed all ceils, setup warmed floor and put ceils back in about 4 hours.
Then I found that I do not have any power anymore, completely, and my back is aching like hell - try to move more than 20 kg buckets of the mortar every several minutes two days in a row... or myabe I just become older.
Looking at the bathroom I think I can say that it is good, although maybe not everyone will agree with my taste. Anyway, next weekend I will finish glueing and setup water system and needed sanitary elements.

/devel/flat :: Link / Comments (0)

Please solve this captcha to be allowed to post (need to reload in a minute): 16 + 3

Comments are closed for this story.