Zbr's days.
July
Sun Mon Tue Wed Thu Fri Sat
28
       
2007
Months
Jul

About TODO Blog RSS Old blog Projects Gallery Notes

Sat, 28 Jul 2007

Big appartment development day.

And start of the big appartment development weekend.

Working from about 20-00 to 3-00 this night and half of the day resulted in completed electricity wiring on the hinged ceiling, finished ceiling paining in the room, checkroom and hall (will cover with another layer though - some colour left from previous layer painings), painted radiator tubes. I also removed old heavy anchor bolts, which hold by hammock, with new ones, which have form of a hook, so it becomes quite easy to get chains which support hammock on and off. Hooks also remove bending force from the chain (which might result in teared chain, which can hold 350 kg in usual direction, but only about 150 in bending).

All above got ability to be completed just because I moved to deveopment shop yesterday evening and bought all needed equipment. I do plan to complete room and checkroom this weekend. And probability of that event to happen is very high. Next task will be bathroom, since washing in my spartan conditions is absolutely unconvenient.
Unfortunately there is no neon cord in Leroy Merlin development shop, so that my ceiling would be fully completed, will search further, but its setup is trivial since all electric parts are already completed.
Maybe I will order a vacuum cleaner and boiler tomorrow, the former is needed to put and floor carpet, since it is very dusty, the latter is essential part of the bathroom and my water system project.

/devel/flat :: Link / Comments (0)

Please solve this captcha to be allowed to post (need to reload in a minute): 52 + 97

Comments are closed for this story.