Zbr's days.
April
Sun Mon Tue Wed Thu Fri Sat
20
         
2007
Months
Apr

About :: TODO :: Blog :: RSS :: Old blog :: Projects :: GIT :: Gallery :: Notes

Fri, 20 Apr 2007

Recent appartment development.


Do you recall my ubercool yellow hinged ceiling?
There is no such ceiling anymore - I've completely repainted the whole ceiling (not only hinged part) into pearl colour - looks really cool, but that colour is very sensitive to even small badness in the surface, so I need to put quite a bit of plaster to fix it. Then I will paint the second layer of colour.
Because of that I needed to polish quite a bit of surface (about 10 square meters on the ceiling), which was slavery work. Eventually I touched my genius part and connected emery paper to the corner-grinding machine (bolgarka, this is a must-have instrument for development as long as hammer drill I think), which allowed to speed things very noticebly, but I still was very time-constrained.
Later evening I started to setup water system, but found that I have only one adjustable spanner, which is not enough to properly fixate all details, so I do not have a proper water system yet. About 1 o'clock this night I found, that there is no water in my flat at all (and that is not my fault).
That was challenging to wash away about 1 millimeter layer of dust from my face using drinking water. Today I used the last drops to wash. That is a reason I did not fixed ceiling bits with plaster.
So, I completed a lot of things, but in a long run did not move any further.
Now I like my ceiling even more.

/devel/flat :: Link / Comments (0)

Please solve this captcha to be allowed to post (need to reload in a minute): 0 - 83

Comments are closed for this story.