|
|
About ::
TODO ::
Blog ::
RSS ::
Old blog ::
Projects ::
GIT ::
Gallery ::
Notes
Sun, 11 Mar 2007
Meanwhile on appartments development side.
Winter is over and I can continue development - today
I completed second plaster layer filling where it was required (there is a place where the last - third one
would be good though, but it is not absolutely required),
so essentially my main ceiling only needs painting right now,
or may be I will fill it with the finish plaster with some kind of
a random pattern spreaded over the ceiling before.
Hinged ceiling needs to be rubbed and repainted in some places.
To get a paint I need to move to the development shop where
I will also buy special screws for my table
implementation.
/devel/flat :: Link / Comments (0)
Please solve this captcha to be allowed to post (need to reload in a minute): 40 - 84
|