|
|
About ::
TODO ::
Blog ::
RSS ::
Old blog ::
Projects ::
GIT ::
Gallery ::
Notes
Sun, 10 Feb 2008
Completed electricity socket setup.
Also replaced electricity switch with the new one and installed
warm floor thermal system in the bathrom, but the latter is not yet
fully completed (wires are connected without good isolation yet
and thermal controller is not placed into its own socket in the wall,
but hungs around on wires), but it work (do not know how good, and
I will turn electricity off when move from home, will check it
thermal capabilities when I'm able to stop the fire...
/devel/flat :: Link / Comments (0)
|