|
|
About
TODO
Blog
RSS
Old blog
Projects
Gallery
Notes
Tue, 22 Jan 2008
Meanwhile at appartment development side.
I spent the whole day filling holes between ceramic tiles
(2-3 mm) with the special water-proof plaster. It is about 23:00 in Moscow,
but things are not yet completed, but I will postpone it for a while,
since tired to work in dust today.
Also got lots of wood plates to either finish table (although they
are thiner than table itself) or start book/bottle shelves
development.
I got about 12 meters of 10 and 13 sm wood plates (three plates of two meters each
for each size), each has 2 sm thickness. That should be enough for smaller installation,
but since I want to have a et of X-shelves about 2 meters high, I will get
more when finish to work with thoe ones. Likely I will start it this weekend.
/devel/flat :: Link / Comments (0)
New DST release: Succumbed to live ant.
This is a maintenance release only and it contains
only following change:
- do not allocate big enough address structure on the stack
during local export node initialization
Great thanks to Serge Leschinsky and Konstantin Kalin for testing.
As usual one can get the latest version from
project homepage
or via git tree.
/devel/dst :: Link / Comments (8)
|