|
|
About
TODO
Blog
RSS
Old blog
Projects
Gallery
Notes
Sun, 23 Dec 2007
Continuing appartments development.
I think I finished ceramic tiles glueing, at least for this year: first, I have no glue
anymore, second, I have to glue only one vertical line with 2.5 tiles width,
where vater hatch will be located, and since I do not have a hatch, I do not glue tiles.
Dirty work in bathroom has been essentially completed - I will fill 2mm holes
between tiles with plaster and attach ceiling soon, and that will be the end.
Next dirty work is ceramic granite in the hall and checkroom - that will take some time,
but since I have no glue and not sure it will be delivered this year, I can postpone this
task too. So, main issues are painting finishing and table.
When my head is aching I frequently think out something really interesting and new,
so I have a new design for the table in the mind, if I will complete it, that will be really great.
First, table is not movable, but attached to wall (potentially two walls in the corner),
end of the table, which does not touch the wall is round and have singe (better steel tube) leg,
another part, which touches the wall has a turn, so table looks like letter 'L' with smaller part
attached to wall (and window), bigger part can be accessible from both sides.
Or something like that...
/devel/flat :: Link / Comments (0)
GPRS sucks!
Even MTS one is so slow... Although it is enough to
read emails and check some news (you know, I have infinite patience
which almost never reaches its end), but I want a normal connection.
I know, there is no Ded Moroz (Santa Claus), so there will be no fast
internet until past New Year vacations (10 days in Russia),
when I will start kicking local ISPs again.
/other :: Link / Comments (0)
|